推拉门施工准备
Construction preparation of sliding door
技术准备:图纸已通过会审,门窗洞口的位置、尺寸与施工图相符,按施工要求作好技术交底工作。
Technical preparation: the drawings have passed the joint examination,
the position and size of door and window openings are consistent with
the construction drawings, and the technical disclosure shall be done
according to the construction requirements.
材料准备:推拉门的材料品种、类型、
地变电阻柜 精密铸造 中频电炉设备 保定断桥铝门窗 保定养老院 镜子批发 启闭机规格、尺寸、开启方向、安装位置及防腐处理应符合设计要求。主要附件及材料:边条、沟槽、滑轮等各种小五金必须符合设计要求。
Material preparation: the material variety, type, specification, size,
opening direction, installation position and anti-corrosion treatment of
sliding door shall meet the design requirements. Main accessories and
materials: all kinds of hardware such as edge strip, groove and pulley
must meet the design requirements.
作业条件:安装前先检查门框和扇有无翘扭、掉漆、硬伤等情况,如有则应进行处理。
Working conditions: before installation, check whether the door frame
and leaf have warping, paint dropping, hard damage, etc., and if so,
deal with them